Sunshine silver/antimony mining and refining project, US

Name of the Project
Sunshine silver/antimony mining and refining project.
Location
Idaho, US.
Project Owner/s
Private company Sunshine Silver Mining & Refining Company (SSMRC).
Project Description
The Sunshine mine is a primary silver project. SSMRC plans to revive the storied silver mines and build the country’s only large-scale, permitted antimony refinery.
The refinery is being upgraded to handle antimony – a mineral essential for US national security and energy resilience.
It could supply 40% of the US’s yearly antimony demand by 2028, increasing to as much as 80% by 2031.
In parallel, SSMRC is progressing engineering and feasibility work to restore the mine’s hoisting system, surface facilities and water treatment infrastructure.
The mine hosts an indicated resource of 3.3-million tonnes grading 1 067 g/t silver for 112-million ounces, with 165-million ounces in inferred resources. SSMRC plans to produce 6.5-million ounces of silver over 25 years, with production of eight-million ounces a year envisaged in the first six years.
Potential Job Creation
To be confirmed.
Net Present Value/Internal Rate of Return
To be confirmed.
Capital Expenditure
Not stated.
Planned Start/End Date
SSMRC plans to publish a feasibility study for a silver/antimony mining and refining operation at the mine in 2027.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None disclosed.
Contact Details for Project Information
Sunshine Silver Mining & Refining, tel +1 208 783 1700 or email info@silveropp.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















