https://newsletter-mw.creamermedia.com
Energy|Engineering|Infrastructure|Mining|PROJECT|Refinery|Refining|Resources|SECURITY|Surface|System|Water|Infrastructure
Energy|Engineering|Infrastructure|Mining|PROJECT|Refinery|Refining|Resources|SECURITY|Surface|System|Water|Infrastructure
energy|engineering|infrastructure|mining|project|refinery|refining|resources|security|surface|system|water|infrastructure

Sunshine silver/antimony mining and refining project, US

Image of US flag and periodic table symbols for silver and antimony

27th March 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sunshine silver/antimony mining and refining project.

Location
Idaho, US.

Project Owner/s
Private company Sunshine Silver Mining & Refining Company (SSMRC).

Project Description
The Sunshine mine is a primary silver project. SSMRC plans to revive the storied silver mines and build the country’s only large-scale, permitted antimony refinery. 

The refinery is being upgraded to handle antimony – a mineral essential for US national security and energy resilience. 

It could supply 40% of the US’s yearly antimony demand by 2028, increasing to as much as 80% by 2031. 

In parallel, SSMRC is progressing engineering and feasibility work to restore the mine’s hoisting system, surface facilities and water treatment infrastructure. 

The mine hosts an indicated resource of 3.3-million tonnes grading 1 067 g/t silver for 112-million ounces, with 165-million ounces in inferred resources. SSMRC plans to produce 6.5-million ounces of silver over 25 years, with production of eight-million ounces a year envisaged in the first six years.

Potential Job Creation
To be confirmed.

Net Present Value/Internal Rate of Return
To be confirmed.

Capital Expenditure
Not stated.

Planned Start/End Date
SSMRC plans to publish a feasibility study for a silver/antimony mining and refining operation at the mine in 2027.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None disclosed.

Contact Details for Project Information
Sunshine Silver Mining & Refining, tel +1 208 783 1700 or email info@silveropp.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 
Advanced Fire Suppression Technologies
Advanced Fire Suppression Technologies

Established on 1 March, 2000, by Barries Barnard, Advanced Fire Suppression Technologies (AFST) and the Advanced Group stands as Sub-Saharan...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.08 0.231s - 106pq - 2rq
Subscribe Now