https://newsletter-mw.creamermedia.com
Challenger Gold|Argentina|Hualilan Gold Project|Gold Mining|Heap Leach|Job Creation|San Juan Province
||||
challenger-gold|argentina|hualilan-gold-project|gold-mining|heap-leach|job-creation|san-juan-province

Hualilan gold project, Argentina

Hualilan project site

Photo by Challenger Gold

24th July 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Hualilan gold project.

Location
Department of Ullum, San Juan province, Argentina.

Project Owner/s
Challenger Gold, through Golden Mining and related project entities.

Project Description
A prefeasibility study published in May 2026, has determined that Hualilan can be developed as a conventional truck-and-shovel openpit mine with on-site processing.

The selected development concept includes a 1.5-million-tonne-a-year process plant incorporating crushing, grinding, flotation, leaching and doré production, and an eight-million-tonne-a-year heap-leach facility, designed to treat suitable ore through modular crushing and leaching. 

This dual-stream approach allows for ore to be routed according to value, metallurgy and overall project economics, consequently improving flexibility and supporting a more resilient operating strategy.

Life-of-mine production is estimated at 1.84-million ounces of gold equivalent over 14.25 years.

The project forecasts production of more than 105 000 oz/y gold equivalent in Year 1 and 2, followed by 12 years of production averaging 135 000 oz/y gold equivalent.

Potential Job Creation
The project is expected to create 900 new jobs.

Net Present Value/Internal Rate of Return
Using a $3 500/oz gold price, the project has a net present value, at a 5% discount rate, of $1.45-billion and an internal rate of return of 45%, with a payback of 2.25 years.

Capital Expenditure
$232-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None disclosed.

Contact Details for Project Information
Challenger Gold, tel +61 8 6385 2743 or email admin@challengergold.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 
M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 24 July 2026
Magazine round up | 24 July 2026
24th July 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.046 0.194s - 116pq - 2rq
Subscribe Now