Boroo and Ulaanbulag mines, Mongolia
Name of the Mine
Boroo and Ulaanbulag mines.
Location
Boroo is located in Selenge province, about 140 km north-west of Ulaanbaatar, in Mongolia. Ulaanbulag is a satellite mine in Tuv province, about 19 km south-east of the Boroo mine and processing complex.
Mine Owner/s
Mongolia-focused precious metals producer and developer Steppe Gold owns the operations through its wholly owned subsidiary Boroo Gold.
Brief Description
Boroo and Ulaanbulag are integrated openpit gold operations covering a combined land package of about 6 594 ha.
The operating portfolio comprises the Boroo hard-rock and placer deposits, the Ulaanbulag satellite deposit and the Bor Nuur exploration licence.
Ulaanbulag ore is transported to the established Boroo processing complex and the two mines share the mining fleet, processing facilities and carbon-in-pulp plant. The operation is based on nominal mining capacity of about 50 000 t/d and an annualised mill-feed rate of 5 000 t/d, or about 1.8-million tonnes a year.
Brief History
Boroo Gold acquired the Boroo project in 1997.
AGR Limited acquired an initial 85% interest in the company in 1998 and increased its interest to 95% in 2000. Cameco Gold, Centerra Gold's predecessor, acquired AGR between 2002 and 2004, and Centerra obtained the remaining 5% of Boroo Gold in 2007.
The Boroo mill started processing ore in 2003 and achieved commercial production on March 1, 2004. Boroo acquired Centerra's Mongolian business, including Boroo and Ulaanbulag, in October 2018. Processing Ulaanbulag ore started in 2021. Steppe Gold acquired Boroo Gold in 2024, consolidating the operations within its Mongolian portfolio.
Primary Metals/Minerals
Gold.
Secondary Metals/Minerals
Not stated.
Geology/Mineralisation
The Boroo area is underlain by folded Lower Palaeozoic Haraa flysch sediments, comprising siltstone, sandstone and greywacke, intruded by granite and granodiorite of the early Palaeozoic Boroo Complex.
Boroo is an intrusion-related, low-silica gold-arsenic sulphide system. Bulk mineable mineralisation is hosted in a strongly quartz-sericite altered and sulphidised, shallow-dipping zone controlled by the Boroo fault.
Mineralisation comprises gold-sulphide zones containing mainly pyrite and arsenopyrite, and subordinate, locally high-grade gold-quartz veins.
Ulaanbulag is geologically similar and is controlled by the shallow-dipping Ulaanbulag fault. Its mineralisation also comprises gold-sulphide alteration zones and gold-bearing quartz veins hosted mainly in altered granitic rocks.
Reserves
Boroo had total proven and probable reserves as at February 1, 2024, of 24.35-million tonnes grading 0.72 g/t gold, containing 567 000 oz. This comprised 16.542-million tonnes of proven reserves grading 0.74 g/t and 7.80-million tonnes of probable reserves grading 0.69 g/t. Ulaanbulag proven and probable reserves totalled 6.17-million tonnes grading 0.66 g/t gold, containing 130 000 oz. This comprised 3.54-million tonnes of proven reserves grading 0.71 g/t and 2.64-million tonnes of probable reserves grading 0.58 g/t.
Resources
Boroo had measured and indicated resources as at January 1, 2024, of 44-million tonnes grading 0.57 g/t gold, containing 805 000 oz, while inferred resources totalled 1.3-million tonnes grading 0.789 g/t, containing 33 000 oz.
Ulaanbulag measured and indicated resources totalled 12.4-million tonnes grading 0.53 g/t gold, containing 213 000 oz, while inferred resources totalled 4.3-million tonnes grading 0.38 g/t, containing 52 000 oz.
Type of Mine
Openpit mines.
Mining Method
Boroo and Ulaanbulag are mined using conventional openpit drill, blast, load and haul methods. Five-metre benches are used, with ore mined on half benches to improve grade control in the shallow-dipping mineralised zones.
Major Infrastructure/Equipment
Shared infrastructure at Boroo includes the openpit workings and mining fleet; crushing and ore-feed facilities; grinding and gravity-concentration circuits; leaching, carbon-in-pulp adsorption and gold-recovery facilities; cyanide-detoxification and arsenic-precipitation circuits; heap-leach pads; a zero-discharge tailings-management facility; dewatering and return-water systems; chemical, reagent and fuel storage; a 110 kV grid connection; water-treatment facilities; warehouses, workshops, offices, accommodation and security facilities.
The principal mining fleet includes hydraulic excavators, 50 t and 100 t haul trucks, and supporting mobile equipment. Ulaanbulag ore is hauled about 19 km to the Boroo processing complex.
Prospects
The combined reserve base is expected to support operations until 2031. The 2024 mine plan envisaged openpit mining continuing into the first half of 2030, followed by the processing of stockpiled mill and heap-leach ore until 2031. The Bor Nuur exploration licence and remaining prospective areas within the consolidated land package provide further exploration potential.
Contact Details
Steppe Gold
Tel +976 7732 1914
Email elisa@steppegold.com
Website https://www.steppegold.com
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation