https://newsletter-mw.creamermedia.com
Afriline|Black Mountain Mining|CITIC Heavy Industries|M&D|Onshore|PPE|TCE|Vedanta Zinc International|WBHO|South Africa|Gamsberg|Mining|Zinc|Northern Cape|Namakwa Special Economic Zone
|||||
afriline|black-mountain-mining|citic-heavy-industries|md|onshore|ppe|tce|vedanta-zinc-international|wbho|south-africa|gamsberg|mining|zinc|northern-cape|namakwa-special-economic-zone

Gamsberg Phase II expansion project, South Africa – update

Image of Gamsberg ore handling system

Photo by Vedanta Zinc International

29th May 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Gamsberg Phase II expansion project.

Location
Namakwa Special Economic Zone, in the Northern Cape, South Africa.

Project Owner/s
Vedanta Zinc International (VZI) subsidiary Black Mountain Mining (BBM).

Project Description
Gamsberg II involves the expansion of mining capacity from four-million tonnes a year to eight-million tonnes a year. Metal in concentrate will increase from an estimated 250 000 t/y to 470 000 t/y.

The project includes the construction of a four-million-tonne-a-year concentrator plant. 

Its current mineral reserves and resources show a potential life-of-mine of 29 years.

Potential Job Creation
The project is expected to create 2 000 to 2 500 jobs during the construction phase and a further 400 to 600 permanent jobs during the peak operations phase. 

Capital Expenditure
Approved capital expenditure has been estimated at $545-million.    

Planned Start/End Date
The expansion project was approved in the fourth quarter of the 2021/22 financial year, with completion is targeted for the second half of the 2026 financial year. 

Latest Developments
Overall progress was estimated at 95.5% as of May 13, 2026. 

Key Contracts, Suppliers and Consultants
Onshore (engineering, procurement and construction partner); TCE (owner’s engineers); M&D (construction partner); WBHO (tailings storage facility); Afriline (external water system); PPE (external power system); and CITIC Heavy Industries (ball and semiautogenous grinding mills).

Contact Details for Project Information
VZI, tel +27 11 685 3960 or email info@vedantaresources.co.za.
 


 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
ACTOM
ACTOM

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (05/06/2026)
5th June 2026 By: Martin Creamer
Photo of Martin Creamer
New cadastre, Sam Molefi, PyroFuZA make headlines
5th June 2026
Magazine round up | 05 June 2026
Magazine round up | 05 June 2026
5th June 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.048 0.625s - 117pq - 2rq
Subscribe Now